Accidents, Safety Analysis & Severe Accidents · C-SA-005

Containment Failure Modes — Bypass, Isolation Failure, Early and Late Failure, and Basemat Melt-Through

Bypass, isolation failure, early and late failure and basemat melt-through, from damage mechanisms to release categories and mitigation features.

Definition

Containment failure modes are the types of path and timing by which the containment loses its function as a barrier against the release of radioactive material in a severe accident: bypass, isolation failure, early failure, late failure and basemat melt-through. The key point is that the term covers not only cases where the structure breaks, but also cases where the structure is intact yet the barrier was never closed (isolation failure) or the release never passes through the barrier at all (bypass).

Principle and mechanism

Two classification axes: path and timing

Failure modes are sorted by release path (does the release pass through the containment atmosphere?) and timing (before or after reactor vessel failure?). The earlier the failure, the less chance aerosols have to deposit or be scrubbed, and the more likely a release before the public has been evacuated, so the risk is larger. NUREG-1150 (1990) grouped release categories on this basis into bypass, isolation failure, early, late and intact. The five types below are a representative teaching classification; in an actual PSA they overlap or are subdivided further depending on the plant and the purpose of the analysis (BMT is sometimes grouped with late failure).

ModeRepresentative mechanismsTimingRelease characteristics
BypassSGTR, ISLOCA (initiating); thermally induced SGTR (after core damage)Early in the accident or after core damageBypasses scrubbing inside containment; can be large and early
Isolation failureIsolation valve fails to close, open penetrationFrom the start of the accidentLeak path from the outset
Early failureHPME/DCH, hydrogen combustion/detonation, steam explosion, rocket modeBefore or just after vessel failureLarge release possible before evacuation (main contributor to LERF)
Late failureOverpressure by steam and non-condensable gases, high temperatureHours to daysGenerally smaller, as deposition and scrubbing have more time
Basemat melt-through (BMT)Concrete erosion by MCCILong after vessel failure (condition dependent)Basemat and soil path; atmospheric release generally small
Containment cutaway with labelled failure paths: bypass via SGTR and ISLOCA and isolation failure drawn as dashed leak paths, early failure at the dome, steam explosion in the cavity, late failure at the wall and basemat melt-through below; a timeline from accident start through core damage, vessel failure and 24 hours after core damage to days shows when each mode can begin
The five representative failure modes by path (dashed: structure intact but a path leaks; solid: structural failure) and by timing on a qualitative, non-linear time axis. Real timing depends on the accident sequence; in PSA the types overlap or are subdivided.

In some PSAs, a sequence in which containment heat removal fails and the containment fails by overpressure before the reactor vessel fails is sometimes treated separately as containment failure before reactor vessel breach (CFBRB, etc.). The classical WASH-1400 (1975) notation — α (in-vessel steam explosion), β (isolation failure), γ (hydrogen combustion), δ (overpressure) and ε (melt-through) — is also still widely used. Later studies assessed the probability of α-mode failure as very low.

Damage mechanisms by mode

  1. HPME/DCH: if the vessel fails while the RCS is at high pressure, melt is ejected as fine particles that heat the containment atmosphere directly; together with hydrogen combustion the pressure rises sharply.
  2. Hydrogen combustion and detonation: deflagration of hydrogen from the Zr–steam reaction and MCCI, flame acceleration, and the dynamic loads of deflagration-to-detonation transition (DDT).
  3. Steam explosion (FCI): after the melt fragments, the vapor films collapse at once and a shock wave forms. An in-vessel explosion raises the concern of an upper-head missile; an ex-vessel explosion loads the cavity structure.
  4. Overpressure and high temperature: decay-heat steam and CO, CO₂ and H₂ from MCCI accumulate and pressurize the containment slowly; high temperature degrades penetration seals.
  5. MCCI and BMT: the melt decomposes and erodes the concrete, releases gases and penetrates the foundation.
  6. Bypass: steam generator tube rupture, or creep rupture of tubes by natural circulation of hot gas in a high-pressure, dry SG; failure of a low-pressure system boundary (ISLOCA).
  7. Rocket mode: the reaction force of a high-pressure vessel failure moves the vessel and damages penetrating piping.

What it means in a plant

Use in Level 2 PSA

Level 1 core damage sequences are grouped into plant damage states (PDS), followed through the headings of the containment event tree (CET) (bypass? → isolation → RCS pressure at vessel failure → early failure → cavity cooling → late failure), and the end states are grouped into release categories (STC, source term categories). Branch probabilities are set by overlaying the load distribution on the containment fragility curve (conditional failure probability as a function of pressure). The RCS pressure at vessel failure (depressurized or not) is not a heading that decides failure directly; it is a state variable that changes the branch probability of early failure such as DCH. End states are assigned to release categories again by release timing, magnitude and scrubbing, and failure modes and release categories are not one-to-one. Early failure, bypass and isolation failure are the main contributors to LERF (large early release frequency).

Simplified containment event tree starting from a plant damage state with five headings H1 no bypass, H2 isolation OK, H3 no early failure, H4 no late overpressure and H5 no basemat melt-through; the no branches end in bypass, isolation failure, early failure, late overpressure and basemat melt-through, and the all-yes path ends intact; bypass, isolation failure and early failure are marked as LERF contributors if large and early
Teaching version of a containment event tree. RCS pressure at vessel failure is a state variable for the DCH branch probabilities; end states are reassigned to release categories by timing, size and scrubbing, so failure modes and release categories are not one-to-one.

Pressure margin: the APR1400 example

The APR1400 containment design pressure is 60 psig (about 0.515 MPa absolute). A severe accident assessment compares the calculated maximum containment pressure with an acceptance pressure set for that assessment; neither the assessed load nor the acceptance criterion is an ultimate failure pressure. The likelihood of failure is evaluated separately with the ultimate pressure capacity and the fragility curve.

Threats and mitigation features (APR1400 example)

ThreatFailure modeMitigation feature
① Combustion or explosion of combustible gasesEarly, late30 PARs and 10 igniters (hydrogen mitigation system)
② High temperature or overpressureLate; before vessel failureSprays, emergency containment spray backup system (ECSBS), sustained water source and heat removal
③ MCCILate overpressure, BMTCavity flooding system (CFS), cavity designed for melt spreading and cooling
④ HPMEEarlySafety depressurization and vent system (rapid depressurization by POSRV)
⑤ DCHEarlyRapid depressurization + cavity geometry that limits melt dispersal
⑥ FCI (steam explosion)EarlyAssessment of cavity structural capacity against dynamic loads (considered together with the cooling benefit of flooding)
⑦ Bypass such as SG creepBypassRCS depressurization, maintaining SG feedwater, isolating bypass paths

HPME and DCH are separate threats, but their countermeasure (depressurization) is shared. Isolation failure is managed with isolation signals and local leak rate testing (LLRT).

Regulatory and design criteria

The criteria below are examples from the United States (US NRC) and the IAEA safety standards.

BasisKey point
SECY-93-087Leak-tight barrier maintained for about 24 hours after core damage (steel Service Level C, concrete Factored Load)
SECY-90-016US advanced reactor policy goal: conditional containment failure probability (CCFP) of about 0.1
10 CFR 50 App. A and JGDC 50 and 53–57 (design margin, isolation); leak rate testing
IAEA SSR-2/1 Rev.1Practical elimination of early or large releases

Easily confused pairs

BypassIsolation failureEarly failureLate failure
Structural integrityMaintainedMaintainedLostLost
PathSystems outside containmentOpen penetrationFailure locationFailure location
Spray and deposition scrubbingNonePartialShortLarge
Typical causeSGTR, ISLOCAValve fails to closeDCH, detonationOverpressure, high temperature

Using the design pressure (60 psig) as the failure pressure is wrong. Failure is judged with the ultimate pressure capacity and fragility curve, which are far above the design pressure. BMT progresses most slowly and follows the basemat path, so it is generally not the mode with the largest atmospheric release. Bypass skips only the scrubbing inside containment; underwater scrubbing on the SG secondary side and similar effects are assessed separately.

Key points at a glance

  1. Definition: types of path and timing by which the containment loses its barrier function in a severe accident.
  2. Bypass: SGTR (spontaneous, or thermally induced creep), ISLOCA — bypasses scrubbing in containment; can be large and early.
  3. Isolation failure: open isolation valves or penetrations — managed by LLRT and isolation signals.
  4. Early failure: HPME/DCH, hydrogen detonation, steam explosion (α), rocket mode.
  5. Late failure: overpressure by steam and non-condensable gases, high temperature — hours to days.
  6. BMT: foundation erosion by MCCI — very slow, soil path.
  7. PSA: PDS → CET → release categories; early failure and bypass dominate LERF.
  8. Regulation: for example, US SECY-93-087 — leak-tight barrier maintained for about 24 hours after core damage; IAEA SSR-2/1 Rev.1 — practical elimination of early or large releases.
  9. APR1400: POSRV, HMS, CFS, ECSBS; design pressure 60 psig, which is not the failure pressure.
Sketch: a time axis from accident start through core damage and vessel failure to hours and days, with dashed bars for bypass and isolation failure from the start and boxes for early failure, late failure and basemat melt-through below the axis
Sketch: the five failure modes on a time axis; a delayed release gives more time for deposition and scrubbing.